State Performance-Based Regulation Using Multiyear Rate Plans for U.S. Electric Utilities

Berkeley Lab published a report in 2016 that discussed two approaches to performance-based regulation (PBR) of electric utilities: multiyear rate plans (MRPs) and performance incentive mechanisms (PIMs).1 The authors described these approaches at a high level and in the context of growing levels